0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

ANZAC Bridge

Structurae a catalogué 5 publication(s) pertinentes.

  1. O'Neill, Ken / Edmonds, Colin (2012): ANZAC Bridge Maintenance Project. Présenté pendant: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, pp. 1468-1475.

    https://doi.org/10.2749/222137912805111997

  2. Mellier, Erik / Kuhn, Eric / Koscher, Xavier / Sylvestre, Aurélien (2013): ANZAC Bridge Stay Cable Upgrade. Présenté pendant: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, pp. 640-641.

    https://doi.org/10.2749/222137813806548659

  3. Tang, Man-Chung (1998): Balancing Act. Dans: Civil Engineering Magazine, v. 68, n. 2 (février 1998), pp. 42-45.
  4. Wheeler, W. Ken / Lothringer, Sue / Bennett, Mark V. (1994): Glebe Island bridge - Australia's new cable-stayed bridge (Australia). Présenté pendant: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994, pp. 307.
  5. Knop, D. / Bishop, H. (1995): Die Glebe-Island-Schrägkabelbrücke in Sydney. Dans: Beton- und Stahlbetonbau, v. 90, n. 12 (décembre 1995), pp. 304-310.

    https://doi.org/10.1002/best.199500490