General Information
Name in local language: | Angeredsbron |
---|---|
Beginning of works: | Fall 1975 |
Completion: | 3 December 1978 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Haunched girder bridge Multi-span continuous girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Västra Götalands län, Sweden |
---|---|
Coordinates: | 57° 47' 58.86" N 12° 0' 45.50" E |
Technical Information
Dimensions
width | 16.95 m | |
height | 47 m | |
total length | 925.4 m | |
main spans | 129 m | |
span lengths | 68 m - 5 x 129 m - 122 m - 66 m | |
number of lanes | 3 | |
roadway / carriageway width | 10.500 m | |
walkway width | 2.600 m | |
abutments | number | 2 |
deck | deck depth | 3.000 - 8.500 m |
piers | height | 21 - 50 m |
number | 7 | |
pile caps | width | 13 m |
length | 21 m | |
thickness | 3 m | |
piles | length | 20 - 50 m |
number | 800 |
Quantities
concrete volume | 20 000 m³ | |
prestressing steel | 500 t | |
reinforcing steel | 1 500 t | |
piles | total length of piles | 30 000 m |
Cost
cost of construction | 40 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- The angered bridge in Göteborg (Schweden). In: IABSE Structures, v. 3 ( 1979). (1979):
- About this
data sheet - Structure-ID
20089257 - Published on:
03/09/2024 - Last updated on:
04/09/2024