General Information
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Location
Location: |
Allach-Untermenzing, Munich, Bavaria, Germany |
---|---|
For: |
|
Crosses: |
|
Part of: | |
Coordinates: | 48° 12' 33.85" N 11° 27' 57.94" E |
Coordinates: | 48° 12' 16.96" N 11° 27' 14.23" E |
Technical Information
Dimensions
total length | 1 400 m | |
clearance | 2 x 16.10 m × 4.80 m | |
tunnel length | 1030 m | |
total width | 34.60 m | |
number of tubes | 2 |
Quantities
concrete volume | 156 000 m³ | |
reinforcing steel | 20 000 t | |
excavated material | 700 000 m³ |
Cost
cost of construction | German Mark 264 000 000 |
Materials
tunnel structure |
reinforced concrete
|
---|
Participants
Owner
Client
Original design
Checking engineering
- Arnfrid Hergenröder (checking engineer)
Co-contractor
- Alfred Kunz GmbH & Co
- Bilfinger Berger SE
- Ed. Züblin AG
- HOCHTIEF AG
- Josef Riepl Bau AG
- Philipp Holzmann AG
- Radmer Bau-AG
- Strabag AG
- Wolff & Müller GmbH & Co. KG
Construction supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 1997. Verkehrsblatt-Verlag, Dortmund (Germany), 1997, pp. 111-126.
- About this
data sheet - Structure-ID
20000767 - Published on:
07/06/2000 - Last updated on:
28/05/2021