General Information
Completion: | 2009 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Single-span two-pylon cable-stayed bridge |
Location
Location: |
Montodine, Cremona, Lombardy, Italy Castiglione d'Adda, Lodi, Lombardy, Italy |
---|---|
Address: | S.S. 591 |
Crosses: |
|
Coordinates: | 45° 15' 16" N 9° 42' 2" E |
Technical Information
Dimensions
total length | 400 m | |
span lengths | 74 m - 252 m - 74 m | |
number of spans | 3 | |
deck | width | 25.50 m |
deck depth | 1.5 m | |
pylon | width | 2.5 m |
pylon height (above deck) | 65 m |
Participants
Design
Main contractor
Steel construction
Bearings
Relevant Web Sites
Relevant Publications
- (2010): Construction Phases and Reception Tests of the New Cable-Stayed Bridge over the Adda River (Northern Italy). Presented at: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, pp. 728-729.
- Il ponte strallato di Bertonico. In: Strade e Autostrade, v. 14, n. 79 (January 2010), pp. 94-95. (2010):
- Un ponte strallato sull'Adda. In: Strade e Autostrade, v. 11, n. 62 (March 2007), pp. 192. (2007):
- Uplifting experience. In: Bridge Design & Engineering, v. 9, n. 33 (4th Quarter 2003), pp. 77. (2003):
- About this
data sheet - Structure-ID
20010802 - Published on:
01/12/2003 - Last updated on:
05/02/2016