Construction Phases and Reception Tests of the New Cable-Stayed Bridge over the Adda River (Northern Italy)
|
Bibliographic Details
Author(s): |
Carmelo Gentile
Roberto Gentile |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010 | ||||
Published in: | IABSE Symposium Venice 2010 | ||||
|
|||||
Page(s): | 728-729 | ||||
Total no. of pages: | 8 | ||||
Year: | 2010 | ||||
DOI: | 10.2749/222137810796063490 | ||||
Abstract: |
The paper focuses on a cable-stayed bridge recently erected about 60 km far from Milan, in the Province of Lecco. After the description of the main characteristics and the construction phases of the bridge, the paper presents the most relevant results obtained from the bridge reception tests, including extensive characterization of the materials, load tests and ambient vibration tests. |
||||
Keywords: |
cable-stayed bridge full-scale test construction phases
|