0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Official designation: BW 4
Beginning of works: 2009
Completion: 2012
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Werre River
Part of:
Carries: A 30 Motorway (Germany)
See also: A 30 Werre East Bridge (2012)
Coordinates: 52° 12' 20.14" N    8° 45' 8.76" E
Show coordinates on a map

Technical Information

Dimensions

total length 308.85 m
span lengths 52.00 m - 83.05 m - 52.00 m - 3 x 32.00 m - 25.80 m
deck width 33.3 m
number of spans 7
bridge surface 10 285 m²
cables diameter 140 mm
length 31 m
number 32

Quantities

substructure concrete volume 6 953 m³
reinforcing steel 969 t
superstructure structural steel 3 581 t
concrete volume 4 360 m³
reinforcing steel 1 186 t

Design Loads

design code(s) DIN FB 101; ARS 10/2003

Cost

cost of construction ca. Euro 30 500 000

Materials

piers reinforced concrete
pylons steel
deck slab reinforced concrete
abutments reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20051110
  • Published on:
    01/01/2010
  • Last updated on:
    05/08/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine