General Information
Project Type
Function / usage: |
Metro tunnel / subway tunnel |
---|---|
Structure: |
Immersed tube tunnel |
Function / usage: |
Railroad (railway) tunnel |
Construction method: |
Immersed tube method Cut-and-cover method |
Location
Location: |
Manhattan, New York, New York, USA Queens, New York, New York, USA |
---|---|
Address: | 63rd Street |
Underneath of: |
|
Part of: | |
Connects to: |
63rd Street Tunnel Connector (2001)
LIRR Manhattan Tunnel (2019) LIRR Queens Tunnel (2019) |
Coordinates: | 40° 45' 36" N 73° 57' 18" W |
Technical Information
Dimensions
width | 11.7 m | |
length | 960 m | |
number of tracks | 2 x 2 | |
immersed tube unit | length | 114 m |
number | 4 |
Chronology
24 November 1969 | Construction of the 63rd Street Tunnel begins. |
---|---|
10 October 1972 | Tunnel construction is completed. |
29 October 1989 | The tunnel is put into service, however only the subway tracks on the upper levels are used for the New York Subway F trains. |
2000 | Completion of the 63rd Street Tunnel Connector which links the 63rd Street Tunnel to the IND Queens Boulevard Line. |
17 December 2001 | The 63rd Street Tunnel Connector is put into service by shifting the route of the F train. |
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20032027 - Published on:
17/09/2007 - Last updated on:
28/05/2021