0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2006
Completion: 2019
Status: under construction

Project Type

Structure: Lined tunnel
Function / usage: Double-deck railroad (railway) tunnel
Construction method: Tunnel boring machine (TBM)

Location

Location: , , ,
Part of:
Connects to: 63rd Street Tunnel (1989)
Grand Central Madison Station (2023)

Technical Information

Dimensions

length 7 681 m
interior diameter 6.20 m
bore diameter 6.70 m

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20064642
  • Published on:
    26/02/2013
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine