Zur Instandsetzung aufgeschwommener Spannglieder an der Illerbrücke Thanners
Author(s): |
Otto Wurzer
K. Reiter Christian Sodeikat |
---|---|
Medium: | journal article |
Language(s): | German |
Published in: | Bautechnik, November 2010, n. 11, v. 87 |
Page(s): | 724-735 |
DOI: | 10.1002/bate.201090131 |
Abstract: |
Damage due to displaced tendons at the Iller River Bridge at Thanners and remedial measures.After prestressing and grouting of the internal tendons of the Iller River Bridge at Thanners pronounced longitudinal cracking was observed on the deck soffit of the western superstructure. A comprehensive investigation of the structure found that the tendons or rather the tendon ducts of the bottom slab of the box girder had floated out of place during concreting of the damaged section. |