General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Single-cell box girder bridge |
Construction method: |
Incremental launching with auxiliary supports |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Immenstadt im Allgäu, Oberallgäu, Bavaria, Germany |
---|---|
Address: | B19n |
Crosses: |
|
Coordinates: | 47° 36' 22.89" N 10° 16' 24.07" E |
Technical Information
Dimensions
total length | 254 m | |
span lengths | 39.0 m - 50.0 m - 76.0 m - 50.0 m - 39.0 m | |
number of spans | 5 | |
deck | width | 11.55 m / 10.95 m |
girder depth | 3.50 m | |
total width | 22.22 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Zur Instandsetzung aufgeschwommener Spannglieder an der Illerbrücke Thanners. In: Bautechnik, v. 87, n. 11 (November 2010), pp. 724-735. (2010):
- About this
data sheet - Structure-ID
20059131 - Published on:
25/11/2010 - Last updated on:
05/02/2016