0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):

Medium: journal article
Language(s): English
Published in: Civil Engineering Magazine, , n. 6, v. 75
Page(s): 50-57
DOI: 10.1061/ciegag.0000023
Abstract:

New Jersey’s first concrete segmental bridge, the Victory Bridge, replaces an aging swing bridge with a twin concrete box girder crossing that sets a U.S. record for match-cast segments. By using a carefully staged construction sequence, the first of the parallel structures was built adjacent to the existing bridge in just 15 months. Superstructure erection of the remaining crossing was completed in just nine months.

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/ciegag.0000023.
  • About this
    data sheet
  • Reference-ID
    10020256
  • Published on:
    23/07/2005
  • Last updated on:
    01/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine