Jose M. Rodriguez
- Precast Concrete Light Rail System Provides Mass Transit Solution for JFK International Airport. In: PCI Journal, v. 49, n. 1 (January 2004). (2004):
- Vibro Concrete Columns Solve Problems for Victory Bridge Approach Fill. Presented at: Geo-Trans 2004, 27-31.07.2004, Los Angeles, California. (2004):
- Victory Once More. In: Civil Engineering Magazine, v. 75, n. 6 (June 2005). (2005):
- Taking the High Road. In: Civil Engineering Magazine, v. 74, n. 7 (July 2004). (2004):