Abstract:

Uncontrolled and unreasonable foundation pit dewatering is often the primary cause of deformation of the nearby buildings. It is therefore imperative to diminish or eliminate negative influence during dewatering. This paper describes the application of artificial recharge to rectify adjacent building deformation due to pumping. Based on the principle of potential function superposition, a water line equation with pumping and injection well's steady or unsteady simulation operation in a confined aquifer is deduced, thereby an “influence radius” concept for unsteady flow has been proposed. Through a project example, the control effect of recharge for nearby building deformation due to pumping has been evaluated, results of which confirm that recharge can be used as an effective management method. Moreover, some suggestions regarding the layout of recharge wells are put forward.

Copyright: © 2016 Yuan Hua and Li Linqing
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

  • About this
    data sheet
  • Reference-ID
    10175589
  • Published on:
    30/12/2018
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine