Use of Artificial Recharge to Rectify Adjacent Building Deformation due to Dewatering

Auteur(s):

Médium: article de revue
Langue(s): anglais
Publié dans: The Open Civil Engineering Journal, , n. 1, v. 9
Page(s): 510-514
DOI: 10.2174/1874149501509010510
Abstrait:

Uncontrolled and unreasonable foundation pit dewatering is often the primary cause of deformation of the nearby buildings. It is therefore imperative to diminish or eliminate negative influence during dewatering. This paper describes the application of artificial recharge to rectify adjacent building deformation due to pumping. Based on the principle of potential function superposition, a water line equation with pumping and injection well's steady or unsteady simulation operation in a confined aquifer is deduced, thereby an “influence radius” concept for unsteady flow has been proposed. Through a project example, the control effect of recharge for nearby building deformation due to pumping has been evaluated, results of which confirm that recharge can be used as an effective management method. Moreover, some suggestions regarding the layout of recharge wells are put forward.

Copyright: © 2016 Yuan Hua and Li Linqing
License:

Cette oeuvre a été publiée sous la license Creative Commons Attribution 4.0 (CC-BY 4.0). Il est autorisé de partager et adapter l'oeuvre tant que l'auteur est crédité et la license est indiquée (avec le lien ci-dessus). Vous devez aussi indiquer si des changements on été fait vis-à-vis de l'original.

  • Informations
    sur cette fiche
  • Reference-ID
    10175589
  • Publié(e) le:
    30.12.2018
  • Modifié(e) le:
    02.06.2021
 
Structurae coopère avec
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine