0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

Use of Artificial Recharge to Rectify Adjacent Building Deformation due to Dewatering

Autor(en):

Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: The Open Civil Engineering Journal, , n. 1, v. 9
Seite(n): 510-514
DOI: 10.2174/1874149501509010510
Abstrakt:

Uncontrolled and unreasonable foundation pit dewatering is often the primary cause of deformation of the nearby buildings. It is therefore imperative to diminish or eliminate negative influence during dewatering. This paper describes the application of artificial recharge to rectify adjacent building deformation due to pumping. Based on the principle of potential function superposition, a water line equation with pumping and injection well's steady or unsteady simulation operation in a confined aquifer is deduced, thereby an “influence radius” concept for unsteady flow has been proposed. Through a project example, the control effect of recharge for nearby building deformation due to pumping has been evaluated, results of which confirm that recharge can be used as an effective management method. Moreover, some suggestions regarding the layout of recharge wells are put forward.

Copyright: © 2016 Yuan Hua and Li Linqing
Lizenz:

Dieses Werk wurde unter der Creative-Commons-Lizenz Namensnennung 4.0 International (CC-BY 4.0) veröffentlicht und darf unter den Lizenzbedinungen vervielfältigt, verbreitet, öffentlich zugänglich gemacht, sowie abgewandelt und bearbeitet werden. Dabei muss der Urheber bzw. Rechteinhaber genannt und die Lizenzbedingungen eingehalten werden.

  • Über diese
    Datenseite
  • Reference-ID
    10175589
  • Veröffentlicht am:
    30.12.2018
  • Geändert am:
    02.06.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine