Towards Self-Recovering Construction Schedules: A new method for periodically updating project plans and optimizing recovery actions
Author(s): |
Hamad Al Jassmi
(Emirates Center for Mobility Research (ECMR), United Arab Emirates University (UAEU), Al Ain 1551, United Arab Emirates)
Yusef Abduljalil (Department of Civil & Environmental Engineering, College of Engineering, United Arab Emirates University (UAEU), Al Ain 1551, United Arab Emirates) Babitha Philip (Emirates Center for Mobility Research (ECMR), United Arab Emirates University (UAEU), Al Ain 1551, United Arab Emirates) |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Asian Architecture and Building Engineering, December 2022, n. 4, v. 22 |
Page(s): | 1-13 |
DOI: | 10.1080/13467581.2022.2153055 |
- About this
data sheet - Reference-ID
10700544 - Published on:
16/12/2022 - Last updated on:
30/05/2023