0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Towards Self-Recovering Construction Schedules: A new method for periodically updating project plans and optimizing recovery actions

This publication lists 23 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10700544
  • Published on:
    16/12/2022
  • Last updated on:
    30/05/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine