Towards Self-Recovering Construction Schedules: A new method for periodically updating project plans and optimizing recovery actions
Auteur(s): |
Hamad Al Jassmi
(Emirates Center for Mobility Research (ECMR), United Arab Emirates University (UAEU), Al Ain 1551, United Arab Emirates)
Yusef Abduljalil (Department of Civil & Environmental Engineering, College of Engineering, United Arab Emirates University (UAEU), Al Ain 1551, United Arab Emirates) Babitha Philip (Emirates Center for Mobility Research (ECMR), United Arab Emirates University (UAEU), Al Ain 1551, United Arab Emirates) |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Asian Architecture and Building Engineering, décembre 2022, n. 4, v. 22 |
Page(s): | 1-13 |
DOI: | 10.1080/13467581.2022.2153055 |
- Informations
sur cette fiche - Reference-ID
10700544 - Publié(e) le:
16.12.2022 - Modifié(e) le:
30.05.2023