Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts
Author(s): |
Abhishek Bhargava
Panagiotis Ch. Anastasopoulos Samuel Labi Kumares C. Sinha Fred L. Mannering |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Construction Engineering and Management, November 2010, n. 11, v. 136 |
Page(s): | 1207-1218 |
DOI: | 10.1061/(asce)co.1943-7862.0000225 |
- About this
data sheet - Reference-ID
10165949 - Published on:
11/12/2018 - Last updated on:
11/12/2018