Abhishek Bhargava
- Predicting Cost Escalation Pathways and Deviation Severities of Infrastructure Projects Using Risk-Based Econometric Models and Monte Carlo Simulation. In: Computer-Aided Civil and Infrastructure Engineering, v. 32, n. 8 (July 2017). (2017):
- Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts. In: Journal of Construction Engineering and Management, v. 136, n. 11 (November 2010). (2010):
- Empirical Assessment of the Likelihood and Duration of Highway Project Time Delays. In: Journal of Construction Engineering and Management, v. 138, n. 3 (March 2012). (2012):
- Frequency of Change Orders in Highway Construction Using Alternate Count-Data Modeling Methods. In: Journal of Construction Engineering and Management, v. 136, n. 8 (August 2010). (2010):