Predicting Cost Escalation Pathways and Deviation Severities of Infrastructure Projects Using Risk-Based Econometric Models and Monte Carlo Simulation
Author(s): |
Abhishek Bhargava
Samuel Labi Sikai Chen Tariq Usman Saeed Kumares C. Sinha |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Computer-Aided Civil and Infrastructure Engineering, July 2017, n. 8, v. 32 |
Page(s): | 620-640 |
DOI: | 10.1111/mice.12279 |
- About this
data sheet - Reference-ID
10415437 - Published on:
05/03/2020 - Last updated on:
05/03/2020