Predicting Cost Escalation Pathways and Deviation Severities of Infrastructure Projects Using Risk-Based Econometric Models and Monte Carlo Simulation
Auteur(s): |
Abhishek Bhargava
Samuel Labi Sikai Chen Tariq Usman Saeed Kumares C. Sinha |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Computer-Aided Civil and Infrastructure Engineering, juillet 2017, n. 8, v. 32 |
Page(s): | 620-640 |
DOI: | 10.1111/mice.12279 |