Three-Stage Least-Squares Analysis of Time and Cost Overruns in Construction Contracts
Auteur(s): |
Abhishek Bhargava
Panagiotis Ch. Anastasopoulos Samuel Labi Kumares C. Sinha Fred L. Mannering |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Journal of Construction Engineering and Management, novembre 2010, n. 11, v. 136 |
Page(s): | 1207-1218 |
DOI: | 10.1061/(asce)co.1943-7862.0000225 |
- Informations
sur cette fiche - Reference-ID
10165949 - Publié(e) le:
11.12.2018 - Modifié(e) le:
11.12.2018