Three-phase CPLEX with quota auction mechanism for dedicated resource-constrained multi-project scheduling problem with calendar constraints
Author(s): |
Feng Kong
Kaixin Chen |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-07-2024-0970 |