Three-phase CPLEX with quota auction mechanism for dedicated resource-constrained multi-project scheduling problem with calendar constraints
Auteur(s): |
Feng Kong
Kaixin Chen |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-07-2024-0970 |