0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors

Author(s): ORCID (Ph.D. Student, Faculty of the Built Environment, Univ. of New South Wales, Postgraduate Research Centre, PhD Lab Level 6, Sydney, NSW 2052, Australia; Lecturer, Dept. of Construction Engineering and Management, National Institute of Transportation-School )
(Assistant Professor, Dept. of Construction Engineering and Management, NIT-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan.)
(Senior Lecturer, Faculty of the Built Environment, Univ. of New South Wales, Level 3, Red Centre West Wing, Sydney, NSW 2052, Australia.)
(Associate Professor, Group of Construction Research and Innovation, Dept. of Project and Construction Engineering, Universitat Politècnica de Catalunya, Bldg. TR5, Despatx 310, C. Colom, 11, Terrassa 08222, Barcelona, Spain.)
Medium: journal article
Language(s): English
Published in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 4, v. 10
Page(s): 04518022
DOI: 10.1061/(asce)la.1943-4170.0000280
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1061/(asce)la.1943-4170.0000280.
  • About this
    data sheet
  • Reference-ID
    10579907
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine