0
  • DE
  • EN
  • FR
  • Internationale Datenbank und Galerie für Ingenieurbauwerke

Anzeige

System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors

Autor(en): ORCID (Ph.D. Student, Faculty of the Built Environment, Univ. of New South Wales, Postgraduate Research Centre, PhD Lab Level 6, Sydney, NSW 2052, Australia; Lecturer, Dept. of Construction Engineering and Management, National Institute of Transportation-School )
(Assistant Professor, Dept. of Construction Engineering and Management, NIT-SCEE, National Univ. of Sciences and Technology, H-12, Islamabad 44000, Pakistan.)
(Senior Lecturer, Faculty of the Built Environment, Univ. of New South Wales, Level 3, Red Centre West Wing, Sydney, NSW 2052, Australia.)
(Associate Professor, Group of Construction Research and Innovation, Dept. of Project and Construction Engineering, Universitat Politècnica de Catalunya, Bldg. TR5, Despatx 310, C. Colom, 11, Terrassa 08222, Barcelona, Spain.)
Medium: Fachartikel
Sprache(n): Englisch
Veröffentlicht in: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, , n. 4, v. 10
Seite(n): 04518022
DOI: 10.1061/(asce)la.1943-4170.0000280
Structurae kann Ihnen derzeit diese Veröffentlichung nicht im Volltext zur Verfügung stellen. Der Volltext ist beim Verlag erhältlich über die DOI: 10.1061/(asce)la.1943-4170.0000280.
  • Über diese
    Datenseite
  • Reference-ID
    10579907
  • Veröffentlicht am:
    08.03.2021
  • Geändert am:
    08.03.2021
 
Structurae kooperiert mit
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine