0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

System Dynamics Model to Determine Concession Period of PPP Infrastructure Projects: Overarching Effects of Critical Success Factors

This publication has been cited in the following 9 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10579907
  • Published on:
    08/03/2021
  • Last updated on:
    08/03/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine