Sprayed concrete lining versus traditional hand mining at Bank station upgrade, London, UK
Author(s): |
Ali Nasekhian
Alexandra Onisie-Moldovan Juan Ares Donal Kelly Paul Dryden |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Proceedings of the Institution of Civil Engineers - Civil Engineering, August 2020, n. 3, v. 173 |
Page(s): | 1-39 |
DOI: | 10.1680/jcien.19.00028 |
- About this
data sheet - Reference-ID
10415079 - Published on:
02/03/2020 - Last updated on:
11/07/2020