Sprayed concrete lining versus traditional hand mining at Bank station upgrade, London, UK
Auteur(s): |
Ali Nasekhian
Alexandra Onisie-Moldovan Juan Ares Donal Kelly Paul Dryden |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Proceedings of the Institution of Civil Engineers - Civil Engineering, août 2020, n. 3, v. 173 |
Page(s): | 1-39 |
DOI: | 10.1680/jcien.19.00028 |
- Informations
sur cette fiche - Reference-ID
10415079 - Publié(e) le:
02.03.2020 - Modifié(e) le:
11.07.2020