Ali Nasekhian
- Uphill excavation of an escalator barrel between operational underground platforms. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 175, n. 4 (novembre 2022). (2022):
- Uphill excavation of an escalator barrel between operational underground platforms. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering. :
- Sprayed concrete lining versus traditional hand mining at Bank station upgrade, London, UK. Dans: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 173, n. 3 (août 2020). (2020):
- Structural Interactions in London Underground Upgrade Projects: The Tottenham Court Road Station Overbridges. Dans: Structural Engineering International, v. 24, n. 4 (novembre 2014). (2014):
- Design of SCL structures in London / Entwurf von Tunnelbauwerken in Spritzbeton-Bauweise am Beispiel London. Dans: Geomechanics and Tunnelling, v. 6, n. 1 ( 2013). (2013):