Juan Ares
- Sprayed concrete lining versus traditional hand mining at Bank station upgrade, London, UK. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 173, n. 3 (August 2020). (2020):
- Improving safety through design at London Underground’s Bank station capacity upgrade. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 173, n. 5 (May 2020). (2020):
- Development of a ground model, targeted ground investigation and risk mitigation for the excavation of an open face cross passage on the underground Elizabeth Line, London. In: Tunnelling and Underground Space Technology, v. 86 (April 2019). (2019):