Scheduling of repetitive construction projects using geographic information systems: an integration of critical path method and line of balance
Author(s): |
Anjul Tomar
V. K. Bansal |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Asian Journal of Civil Engineering, March 2019, n. 4, v. 20 |
Page(s): | 549-562 |
DOI: | 10.1007/s42107-019-00123-3 |
- About this
data sheet - Reference-ID
10299343 - Published on:
29/06/2019 - Last updated on:
29/06/2019