Scheduling of repetitive construction projects using geographic information systems: an integration of critical path method and line of balance
Auteur(s): |
Anjul Tomar
V. K. Bansal |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Asian Journal of Civil Engineering, mars 2019, n. 4, v. 20 |
Page(s): | 549-562 |
DOI: | 10.1007/s42107-019-00123-3 |
- Informations
sur cette fiche - Reference-ID
10299343 - Publié(e) le:
29.06.2019 - Modifié(e) le:
29.06.2019