0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Scheduling of repetitive construction projects using geographic information systems: an integration of critical path method and line of balance

This publication has been cited in the following 6 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10299343
  • Published on:
    29/06/2019
  • Last updated on:
    29/06/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine