0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Schedule-cost optimization in high-rise buildings considering uncertainty

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-12-2023-1217.
  • About this
    data sheet
  • Reference-ID
    10789139
  • Published on:
    20/06/2024
  • Last updated on:
    20/06/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine