Schedule-cost optimization in high-rise buildings considering uncertainty
Auteur(s): |
Jinting Huang
Ankang Ji Zhonghua Xiao Limao Zhang |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-12-2023-1217 |
- Informations
sur cette fiche - Reference-ID
10789139 - Publié(e) le:
20.06.2024 - Modifié(e) le:
20.06.2024