• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv

Author(s):





Medium: journal article
Language(s): en 
Published in: Advances in Civil Engineering, , v. 2020
Page(s): 1-15
DOI: 10.1155/2020/6049608
Copyright: © 2020 Weiqiang Qi et al. et al.
License:

This creative work has been published under the Creative Commons Attribution 4.0 International (CC-BY 4.0) license which allows copying, and redistribution as well as adaptation of the original work provided appropriate credit is given to the original author and the conditions of the license are met.

Advertisement

  • About this
    data sheet
  • Reference-ID
    10429558
  • Published on:
    14/08/2020
  • Last updated on:
    14/08/2020