Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv
This page can only be viewed if you are logged in. If you do not have an account yet, you can register here for My Structurae completely free of charge.