0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Yang, Zhiyong / Shao, Xiaokang / Qi, Weiqiang / Jiang, Yusheng / Yang, Xing (2023): Deformation Mechanism and Controlling Strategies of Leading Tunnel Induced by Close-Spaced Lagging EPBS Driving. In: International Journal of Civil Engineering, v. 21, n. 11 (June 2023).

    https://doi.org/10.1007/s40999-023-00850-4

  2. Yang, Xing / Yang, Zhiyong / Hou, Gongyu / Jiang, Yusheng / Shao, Xiaokang / Qi, Weiqiang (2022): Evaluation of the Active Limit Support Pressure for Shield Tunnel Face in Clay–Sand Interface Mixed Ground. In: International Journal of Geomechanics, v. 22, n. 7 (July 2022).

    https://doi.org/10.1061/(asce)gm.1943-5622.0002404

  3. He, Qing / Xu, Liying / Yang, Zhiyong / Qi, Weiqiang / Zhang, Zhigang / Shen, Ziyu (2021): Research on the Prediction Model of Shield Advancement Rate in Sandy Cobble Ground of Beijing. In: Advances in Civil Engineering, v. 2021 (January 2021).

    https://doi.org/10.1155/2021/6695464

  4. Qi, Weiqiang / Yang, Zhiyong / Jiang, Yusheng / Shao, Xiaokang / Yang, Xing / He, Qing (2020): Structural Deformation of Existing Horseshoe-Shaped Tunnels by Shield Overcrossing. In: KSCE Journal of Civil Engineering, v. 25, n. 2 (November 2020).

    https://doi.org/10.1007/s12205-020-0599-8

  5. Yang, Zhiyong / Ding, Yaowen / Jiang, Yusheng / Fang, Kuanda / Dong, Linwei / Qi, Weiqiang / Wei, Zheng (2020): Study of the Construction Sequence of Overlapping Tunnels by the Shield Tunneling Method: A Case Study of the Longest Overlapping Tunnel in China. In: Advances in Civil Engineering, v. 2020 (January 2020).

    https://doi.org/10.1155/2020/4909750

  6. Qi, Weiqiang / Yang, Zhiyong / Jiang, Yusheng / Liu, Zhiyong / Guo, Yinxin / Yang, Xing (2020): Risk Mitigation and Construction Control for Effective Underwater Recovery of an EPB Shield: A Case Study of the First Metro Tunnel in Tel Aviv. In: Advances in Civil Engineering, v. 2020 (January 2020).

    https://doi.org/10.1155/2020/6049608

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine