0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A risk identification procedure for construction contracts—a case study of power station projects in Egypt

Author(s):

Medium: journal article
Language(s): English
Published in: Civil Engineering and Environmental Systems, , n. 1, v. 24
Page(s): 3-14
DOI: 10.1080/10286600600910104
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/10286600600910104.
  • About this
    data sheet
  • Reference-ID
    10191891
  • Published on:
    10/12/2018
  • Last updated on:
    10/12/2018
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine