A risk identification procedure for construction contracts—a case study of power station projects in Egypt
Auteur(s): |
Amr A. G. Hassanein
Hala M. F. Afify |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering and Environmental Systems, mars 2007, n. 1, v. 24 |
Page(s): | 3-14 |
DOI: | 10.1080/10286600600910104 |
- Informations
sur cette fiche - Reference-ID
10191891 - Publié(e) le:
10.12.2018 - Modifié(e) le:
10.12.2018