Amr A. G. Hassanein
- Building Egypt 1 – a general indicator cost index for the Egyptian construction industry. In: Engineering, Construction and Architectural Management, v. 13, n. 5 (September 2006). (2006):
- Financial and operational performance indicators applied to public and private water and wastewater utilities. In: Engineering, Construction and Architectural Management, v. 14, n. 5 (September 2007). (2007):
- Claims management in the Egyptian industrial construction sector. A contractor's perspective. In: Engineering, Construction and Architectural Management, v. 15, n. 3 (May 2008). (2008):
- Claims management in the Egyptian industrial construction sector: a contractor's perspective. In: Engineering, Construction and Architectural Management, v. 15, n. 5 (September 2008). (2008):
- Time constraints set by prime contractors for their sub‐contractors. Methods that prime contractors use in allocating time windows for their sub‐contractors are examined. The major activities are discussed and divided into pacing and non‐pacing types. In: Building Research & Information, v. 24, n. 5 ( 1996). (1996):
- Factors affecting the bidding behaviour of contractors in Egypt. This paper contains the results of a questionnaire survey conducted among a sample of the large size construction contractors operating in Egypt and should provide useful insight to international contractors, as well as to those contemplating entry into this market. In: Building Research & Information, v. 24, n. 4 ( 1996). (1996):
- A bidding decision index for construction contractors. This study presents the application of a systematic decision making methodology to aid contractors in deciding whether or not to bid for a certain project. In: Building Research & Information, v. 24, n. 4 ( 1996). (1996):
- A risk identification procedure for construction contracts—a case study of power station projects in Egypt. In: Civil Engineering and Environmental Systems, v. 24, n. 1 (March 2007). (2007):