0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Time constraints set by prime contractors for their sub‐contractors

Methods that prime contractors use in allocating time windows for their sub‐contractors are examined. The major activities are discussed and divided into pacing and non‐pacing types

Author(s):

Medium: journal article
Language(s): English
Published in: Building Research & Information, , n. 5, v. 24
Page(s): 293-301
DOI: 10.1080/09613219608727545
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1080/09613219608727545.
  • About this
    data sheet
  • Reference-ID
    10366761
  • Published on:
    27/08/2019
  • Last updated on:
    27/08/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine