0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Risk evaluation of mega infrastructure construction supply chain in engineering-procurement-construction projects: an integrated fuzzy AHP and fuzzy DEMATEL approach

Author(s):
ORCID
Medium: journal article
Language(s): English
Published in: Engineering, Construction and Architectural Management
DOI: 10.1108/ecam-05-2023-0472
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1108/ecam-05-2023-0472.
  • About this
    data sheet
  • Reference-ID
    10760945
  • Published on:
    23/03/2024
  • Last updated on:
    23/03/2024
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine