Risk evaluation of mega infrastructure construction supply chain in engineering-procurement-construction projects: an integrated fuzzy AHP and fuzzy DEMATEL approach
Auteur(s): |
Runze Yu
Li Ma |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Engineering, Construction and Architectural Management |
DOI: | 10.1108/ecam-05-2023-0472 |
- Informations
sur cette fiche - Reference-ID
10760945 - Publié(e) le:
23.03.2024 - Modifié(e) le:
23.03.2024