0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory

This publication lists 69 references to other publication(s):

  • About this
    data sheet
  • Reference-ID
    10426254
  • Published on:
    13/07/2020
  • Last updated on:
    13/07/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine