Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory
Author(s): |
Long Chen
Qiuchen Lu Xiaojing Zhao |
---|---|
Medium: | journal article |
Language(s): | English |
Published in: | Journal of Management in Engineering (ASCE), September 2020, n. 5, v. 36 |
Page(s): | 04020066 |
DOI: | 10.1061/(asce)me.1943-5479.0000829 |
- About this
data sheet - Reference-ID
10426254 - Published on:
13/07/2020 - Last updated on:
13/07/2020