0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rethinking the Construction Schedule Risk of Infrastructure Projects Based on Dialectical Systems and Network Theory

This publication has been cited in the following 15 other publication(s):

  • About this
    data sheet
  • Reference-ID
    10426254
  • Published on:
    13/07/2020
  • Last updated on:
    13/07/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine