Research on Forecasting Technology of Single Base Tower Cost in Transmission Line Engineering

Author(s):





Medium: journal article
Language(s): English
Published in: IOP Conference Series: Materials Science and Engineering, , n. 1, v. 729
Page(s): 012042
DOI: 10.1088/1757-899x/729/1/012042
Abstract:

For a long time, the overhead transmission line project budget, completion settlement and financial final accounts are all valued according to the entire line. The project construction management and asset collection have not yet been refined. The management is not separately calculated according to the actual investment of different towers, and cannot be reflected in each base tower. The actual cost level and the accuracy of the cost need to be further improved. Therefore, this paper combines the actual pain points and difficulties of overhead line engineering cost management, and innovatively builds a pricing model based on a single base tower. When the company strengthens the construction drawing budget management, improves the project settlement level, accurately controls risks, and realizes high-quality management of cost management. The level of leanness is of great practical significance.

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1088/1757-899x/729/1/012042.
  • About this
    data sheet
  • Reference-ID
    10675353
  • Published on:
    12/06/2022
  • Last updated on:
    12/06/2022
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine